CASE STUDY - BIZTALK REPLACEMENT

Transdev retires BizTalk in production — without disrupting operations

Old BizTalk environments have a habit of becoming both business-critical and strictly “do not touch.” This Transdev case shows what it takes to move on — without turning production into a company-wide stress test.

Most teams don’t worry about BizTalk because it’s old.
They worry because it’s old, deeply wired into operations, and still carrying more of the business than anyone really wants to admit.

That’s why replacing it is rarely a “pick a weekend and hope for the best” kind of project.

In our new Transdev case study, you can see what a controlled BizTalk transition looks like in a live production environment — with 300+ integrations, 40+ connected systems, and operations continuing throughout the transition.

No dramatic cutover.
No rebuild-everything detour.
Just a gradual move away from legacy middleware dependency while the business kept running.

If you’re dealing with the same kind of integration backbone — large, business-critical, and not exactly something people line up to touch — this one will feel familiar.

Read the full Case study->

Other case studies –
(and there’s more where this came from – stay tuned!)
  • Transdev retires BizTalk in production — without disrupting operations

  • Transdev: From scattered integrations to a fully traceable, orchestrated backbone.

  • RelyITS turned integrations into innovation – scaling smarter